Skip to content

Sourcing

Factories we would put our own name on.

Anyone can send your tech pack to forty suppliers and forward the cheapest reply. The value is in knowing which three can actually build your bag at your price, at your quality, on your dates — and in staying on it once the PO is placed.

Capability

What we build.

Handbags and accessories, at private-label and white-label, from first sketch or from an existing sample you want made better or cheaper.

Categories

  • Totes and shoppers
  • Crossbody and shoulder
  • Backpacks and rucksacks
  • Clutches and evening
  • Travel, weekender, luggage
  • Small leather goods and wallets
  • Belt bags and slings
  • Laptop and work bags

Materials

  • Full-grain and corrected-grain leather
  • Suede and nubuck
  • Vegan PU and PVC
  • Recycled nylon and RPET
  • Waxed and organic cotton canvas
  • Cork, piñatex and bio-based
  • Jacquard and coated fabric
  • Hardware: zinc, brass, custom plating

Construction

  • Turned-edge and raw-edge
  • Piped and bound seams
  • Structured and unstructured bodies
  • Custom hardware and moulds
  • Debossing, hot-stamp, screen print
  • Embroidery and appliqué
  • Custom linings and labelling
  • Dust bags, boxes, retail packaging

Network

Four countries, chosen per programme.

Country is a commercial decision — duty, lead time, MOQ and construction all pull in different directions. We will tell you which one your bag belongs in, and why.

China

Guangdong · Hebei · Zhejiang

The deepest bench for hardware, structured leather and complex construction. Best for programmes where tooling, plating and finishing matter more than the last few cents.

Vietnam

Ho Chi Minh City · Bình Dương

Strong on synthetics, nylon and technical bags, with tariff positioning that often decides the sourcing conversation for US-bound goods.

India

Kolkata · Chennai · Kanpur

Genuine leather craft at accessible MOQs — the right call for smaller runs, artisanal finishes and vegetable-tanned programmes.

Cambodia

Phnom Penh

Duty-advantaged access to the EU under EBA, with capacity that suits high-volume, simpler constructions.

Process

Six stages, and what you get from each.

Every stage produces an artefact that lives in the platform, so the programme is auditable long after the people who ran it have moved on.

  1. 01

    Brief and feasibility

    Tech pack, reference sample or sketch, plus your target landed cost and volume. We come back with what is buildable, what it will really cost, and where the risk sits.

    Feasibility note · indicative price band

  2. 02

    Factory matching

    We shortlist from suppliers we already audit and already work with. Two or three that genuinely fit — not a mass RFQ blasted at forty factories.

    Shortlist · capability and capacity profile

  3. 03

    Costing and terms

    Line-by-line costing — materials, hardware, labour, packaging, wastage. You see the build-up, not just a number, and we negotiate against it.

    Costed BOM · MOQ and lead time · incoterm

  4. 04

    Sampling

    Proto, counter-sample, fit and materials approval, then a sealed sample that becomes the reference for every inspection that follows.

    Approved sealed sample · approved trim card

  5. 05

    Production and QC

    PO issued in the platform. Materials-in, cutting, assembly and finishing milestones posted by the supplier. Inline inspection while there is still time to correct, then final QC at AQL 2.5.

    Milestone log · inline and final QC reports

  6. 06

    Pack, document, ship

    Carton plan, labels and packing list generated from the packed quantities. Export documents assembled, booking made, delivery note issued against the PO.

    Packing list · CI · COO · delivery note

Compliance and QC

The part nobody enjoys, done properly.

A failed lab test or a missed audit costs more than the entire margin on the order. We treat compliance as part of the build, not as paperwork at the end.

Product testing

REACH, CPSIA, California Prop 65, azo dyes, phthalates, heavy metals and PFAS screening through accredited third-party labs.

Social audits

BSCI, Sedex/SMETA or a client's own audit protocol, refreshed on the cycle your compliance team requires.

Inspection

Inline and final inspection at AQL 2.5 by default, tightened to 1.5 or 1.0 on critical defects when the programme warrants it.

Traceability

Material origin, tannery and hardware source recorded against the order — because increasingly you will be asked to prove it.

Commercial

The numbers people ask for first.

Indicative, and deliberately so — the real answer depends on your construction and volume. But this is the shape of it.

Incoterms
EXW, FOB, CIF, CFR, DAP, DDP
Typical MOQ
300–500 units per style/colourway, lower on selected leather programmes
Sampling lead time
10–21 days per round, depending on hardware and tooling
Production lead time
45–75 days after sample and materials approval
Payment
Standard LC, TT deposit and balance, or open account against agreed terms
Freight
Sea LCL/FCL and air, consolidated out of HKG, SZX, SGN and MAA

Send the bag. We will tell you what it really costs.

A tech pack, a photo of a reference sample, or a paragraph describing what you want. We reply with feasibility, a price band and the country we would build it in.